Camp Navajo Belmont Pistol Military Training Range Belmont, AZ
This is a 15 lane active target pistol practice range. It includes 5 small buildings with a total square footage of approx 4900: 1 control tower 2 story, 1 ammo building, 1 latrine, 1 shade structure with bleachers, 1 GI building. A standard parking lot and all utilities.

Owner:AZ Department of Emergency & Military Affairs Type of Project:Military Training Range
Architect:Morrison – Maierle, Inc Cost:$ 2,836,300
Completion:January 2011   
 
Ak-Chin Santa Cruz Industrial Park – White Shell Building Maricopa, AZ
17,500 sf new construction on 1.5 acre lot. Industrial Park (White Shell Building) will include 5 units ranging in square footage from 1,522 – 3,165. Each unit includes front and back entrance, loading/unloading area, 2 offices and restroom. Exterior will include masonry and stone veneer. Parking lot includes 33 parking spaces plus rear truck well. Renovations to the existing M&S Building to include a new façade, roll up doors, roof and a covered entrance with finishes to match the new White Shell Building.

Owner:Ak-Chin Indian Community Type of Project:Shell Building
Architect:Stroh Rogers Architects Cost:$ 1,223,334
Completion:TBD   
 
Pantano River Park Tucson, AZ
Site grading, asphalt paving, concrete flatwork, concrete headers, concrete curbs, integral color concrete paving, curb ramps, stone & CMU masonry, steel signs, benches, masonry seat walls, masonry and cast-in-place concrete retaining walls, per-engineered "ocotillo" shade structures, steel fence, steel railings, prefabricated steel "Ocotillo" sculpture, picnic tables, stabilized decomposed granite trail, soil cement, landscaping, irrigation, construction restroom with connection to public utilities, parking, lighting, electric service.

Owner:Pima County Procurement Dept. Type of Project:Community Park
Architect:Olsson Associates Cost:$ 2,405,500
Completion:August 2010   
 
Falcon Field VAC Phase 4 Mesa, AZ
This project is part of the Runway Incursion Prevention program at Falcon Field Airport, in accordance with the FFA and Homeland Security regulations and guidelines. Includes contraction of 5 new motorized gates, lighting, access control system and communications infrastructure.

Owner:City of Mesa Type of Project:Site Work
Architect:N/A Cost:$764,824
Completion:TBD   
 
67th & 43rd Ave Improvements Phoenix, AZ
Work at the 67th Ave & Indian School location includes 9,477 SY of Subgrade Preparation; 4,038 tons Asphaltic Concrete; 177 LF Concrete Curb and 55 LF Curb & Gutter; 255 SF Concrete Driveways; 152 SF Concrete Bus Bay Pavement; 375 SF Bus Shelter Accessory Pads, Installation of 12 street lights and various other miscellaneous items.

Owner:City of Phoenix Type of Project:Site Work
Architect:N/A Cost:$612,089
Completion:TBD   
 
Happy Valley Park and Ride Phoenix, AZ
Project consists of park and ride facility consisting of 512 parking spaces plus motorcycle and bicycle racks. Canopied areas with Kiosk structures, security building, bus ramp and passenger loading areas. Landscaping along with provisions for onsite and offsite utilities and adjacent street constructions.

Owner:City of Phoenix Type of Project:N/A
Architect:Entellus, Inc Cost:$ 2,546,163
Completion:September 2010   
 
Canada del Oro Linear Park Tucson, AZ
The project will include a 10’-12’ paved path, an 8’ DG path, a pedestrian bridge, underpasses at Ina Road and Magee Road, staging areas near Thornydale Road and near the Shannon Road and Magee Road intersection, and associated items as needed to complete the project work.

Owner:Pima County Department of Transportation Type of Project:Community Park
Architect:Pima County Regional Flood Control Engineering Dept Cost:$ 1,700,000
Completion:January 2011   
 
Indian Bend Wash Multi-Use Path Scottsdale, AZ
Construction of a 12’ wide concrete pathway with 2’ wide decomposed granite shoulder, including an underpass at Chaparral Rd, storm water pump station, retaining wall, landscaping and irrigation. All related incidental items.

Owner:City of Scottsdale Type of Project:Public Use Pathway
Architect:City of Scottsdale Cost:$ 860,000
Completion:December 2010